Industrial Contracting Services

MİMAŞ serves major international Oil and Gas Companies for their erection needs on oil & gas fields, refineries, processing plants, tank farms, pipelines, production and related buildings etc. for the following major activities.

– Plant Erection (Process plants, GOSPs, Production Facilities)

– Pipelines & Process Piping Works

– Oil Field Services (separators, manifolds, pig equipment, flares, E&I, etc.)

– Tank Farms Fabrication & Erection

– Tank Maintenance, Demolishing, Tie-in Works, Insulation & Painting

– Warehouses, Factory Buildings and Production Facilities

The scope of works that MİMAŞ renders varies from engineering to commissioning; as per the project requirements such as civil, mechanical and E&I works.

Internationally recognized & renowned local companies such as TÜPRAŞ, ATAŞ, BP, SHELL, POAŞ, TOTAL OIL, MOBİL, FOSTER WHEELER, LINDE, AIR LIQUID, AGOCO, ERDEMİR, ZEECO, ARCELOR, SOCAR, ERDEMİR, İSDEMİR, ABDİ İBRAHİM, SABANCI HOLDING are among MİMAŞ clients Furthermore, MİMAŞ is the term contractor of BP and Shell for their maintenance and grassroot projects on their existing oil terminals. As of 2021, MİMAŞ has been chosen as “Call Off Contractor” for Tüpraş Refineries.

Selected Projects 

  • TCO (Tengiz Chevron Oil) - Derrick Flare & Risers

    • Erection of 2x185 mt.
    • Derrick Flare & 6x Risers
    • Erection : 2.600 tons
    • Bolts & Nuts : 32.000 pcs
      E&I : 6.000 mt.
    TCO (Tengiz Chevron Oil) - Derrick Flare & Risers
  • AİR LİQUİDE - Air Separation Unit Civil & Erection Works

    • Complete Construction & Erection of 2x Air Separation Plant
    • Earth Works : 13.000 m³
    • Structural Steel : 370 tons
    • Equipment Erection : 1.870 tons
    • Piping : 22.000 wdi: (SS,Alloy,CS)
    • E&I : 38.000 meters
    AİR LİQUİDE - Air Separation Unit Civil & Erection Works
  • TÜPRAŞ - Oxygenate Tank & Control Sikds Fabrication and Erection

    • Fabrication and Construction of Oxygenate Tank & Control Skids.
      (Dia: 40 mt. ; h: 8.5 mt.)
    • Earth Works : 19.000 m³
    • Concrete : 2.400 m³
    • Piles : 628 ea
      Tank Fabrication & Erection : 480 ton
    • Other Fabrication : 80 ton
    • Piping : 110 ton
    TÜPRAŞ - Oxygenate Tank & Control Sikds Fabrication and Erection
  • LİNDE GAS - Relocation of Air Separation Plant

    • Relocation of Air Separation Plant
    • Earth works : 26.000 m³
    • Concrete : 1.700 m³
    • Structural Steel : 210 tons
      Equipment
    • Dismantling : 900 tons
    • Equipment Erection : 900 tons
    • Piping : 9.000 wdi
    • Others : Misc. Renewals of Instrumentation,
      maintenance of equipment etc.
    • E&I : 18.000 mt.
    LİNDE GAS - Relocation of  Air Separation Plant
  • AGOCO - Crude Oil Tanks Renovation

    • Refurbishment of 2 x 550.000 Barrels
    • Floating Roof Crude Oil Tank,
    • Rebottoming/Reroofing : 1.600 tons
    • Foundation Repairs, Shell Repairs,
    • New fire fighting system, E&I
    AGOCO - Crude Oil Tanks Renovation
  • RASCO - Refurbishment of Seawater Intake System

    • Ras Lanuf Seawater Intake System Renovation including steel structures, underwater concrete canals & pumping station, pond going deep as -20 mt. 30.000² renovation of steel and concrete surfaces . Renovation of 3 km. long jetty complete with painting, E&I works.
    RASCO - Refurbishment of Seawater Intake System

    Plant Erection

    Pipelines & Process Piping Works

    Plant Erection

    UHDE Urea & Ammonia Plant Erection SS&CS Pipe Fabrication & Erection

     

    5.500 tons of structural steel erection, 1.200 tons of SS&CS piping fabrication & erection, 1.700 tons of equipment erection, partial E&I works, Manhours: ~ 750.000

    TÜPRAŞ Construction & Erection of 

    “Selective Hydrogeneration Unit”,

     “Spent Caustic Treatment Unit”

    The project consists of partial engineering & procurement and complete erection of the Hydrojenation and Caustic Treatment Units in an operating refinery with “0” accident. Project Highlights: Site preparation, civil works, structural steel fabrication and erection (~ 900 tons), piping fabrication and erection (~ 250.000 wdi), equipment erection, caustic tanks fabrication and erection, E&I, fire proofing, pre-commissioning and commissioning assistance to owner. Manhours: ~ 635.000

    Pipelines & Process Piping Works

    TÜPRAŞ Off-site Piping Works

     

     

    Piping Works of the 2nd expansion of the refinery; on-site & off-site areas 12.000 tons of pipe fabrication and erection, including miter & tank nozzles, steam tracing, jacketed piping, tie in works, 15.500 m²  surge pond, 1.100 ton steel pipe racks, insulation and E&I works.

    Tank Maintenance, Demolishing, Tie-in works, Insulation & Painting

    TÜPRAŞ Refinery Crude Oil Tank
    Refurbishment Project

    Complete refurbishment of a 90.000 m³ tank including of fabrication of new floating roof, complete rebottoming (changing of plates, civil foundation works), complete refurbishment of fire fighting system, complete blasting & painting, inspection of shell plates & changing of non-conforming ones.

     SHELL Tank Terminal Maintenance Project

    Complete refurbishment of 6 tanks from 7.000 m³ to 65.000 m³ capacity inclusive of shell changing & inspection works, reroofing & rebottoming, renewal of the electrical & instrumentation works, complete blasting & painting, insulation works renewal, cooling line renewal of the tanks, foam system redesign & renewal.